Head Office
VTK Structures Limited
Rivington House
82 Great Eastern Street
London
EC2A 3JF

Tel: 020 7692 8200
Fax: 020 7692 8201

Email: info@vtksl.com

Overview

 

  • Just-In-Time Delivery

  • Safe (ground based) access for attachment of lift beams

  • Walls and panels accurately positioned in minutes (!)

  • Immediately self stable

  • Insitu concrete fill at convenient time:  non critical-path activity

In addition to design and manufacture, Verteka Limited undertake the corresponding installation ensuring the core scope of works remain simple.

Erection and concrete filling activities are undertaken by Verteka's installation team. Transport, concrete supply and any temporary craneage requirements can be organised by Verteka Limited as part of Verteka's standard scope of works.

The straight forward installation process is summarised below in the slideshow:

[Prev] [Play] [Next]

Installation

Subsequent panels and modules quickly and accurately interlock with previous panels
>
<

Installation by main or sub-contractor can be arranged and Verteka will provide training and equipment as necessary.

Visit Verteka's informal YouTube site for site installation footage.